PE Welding Projects

Client and LocationDescriptionPhotos
Client: Taupo Trenching
Location: Taupo NZ
Weld and Hydro test 2.6km of 315OD PE pipe.
Client: Works Infrastructure
Location: Clandeboye, Canterbury NZ
Weld 5km of 800OD PE pipe for the Clandeboye Ocean Outfall project.
Client: BG Contracting
Location: Rangiora NZ
Weld 5.4km of 450OD PE pipe.
Client: Dormer Construction
Location: Waimakariri NZ
Weld 3km of 710OD PE pipe.
Client: Works Infrastructure
Location: Timaru NZ
Weld 1000OD PE pipe.
Client: Transpower
Location:Highbrook, East Tamaki NZ
Installation of 3no. 500m sections of trefoil 225mm polyethylene ducts.
Client: Manukau Wastewater Services
Location: Manukau NZ
Pipeline Subcontracts on Project Manukau $400m upgrade to Mangere Wastewater Treatment Plant.
Construction of HDPE Waste and potable water pipelines.
Client: Water Dynamics Irrigation
Location: Waihopai Valley Vineyards NZ
Weld 6.4 km of HDPE pipeline ranging from 355mm to 1000mm OD, and 8.5 km of pipeline from 355mm down.
Clinet: Bankhouse Vineyards
Location: Marlborough NZ
Weld 2.2 km of HDPE pipeline ranging from 355 to 710mm and 7.0 km of pipeline from 355mm OD down.
Client: Inframax
Location: Wanganui River NZ
Weld and Hydro test 600m 1000OD PE pipe.  